The Power Hammer Continues » Upgraded Anvil

I constructed a box around the central support tower and filled it with roughly 300 lbs of sand that is mixed with used motor oil and a little bentonite to make it sticky. I hope it will add a little more weight and dampen vibration as energy from the dies works its way to the floor.

The central tower will also be filled with sections of 2 inch solid bar stock cut flush with the top of the tubing and packed in with more sand.

Advertisements

0 Responses to “Upgraded Anvil”



  1. Leave a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s




Advertisements
November 2018
M T W T F S S
« Sep    
 1234
567891011
12131415161718
19202122232425
2627282930